
The equipment behind measurements you can trust.
Some measurements need more than a prepared conductor.
Two of the most demanding jobs in a high-voltage lab are injecting very high currents into a conductor and measuring resistance you can trust. Both come down to how cleanly and evenly current moves through the contact at the conductor end.
ReliBond builds that contact with the Terminator In-Door, then adds the right equipment for the test in front of you. The Power Injector handles high-current injection. The Equalizer makes resistance measurement reliable.

Power Injector
High current, injected with almost no loss.

What
The Power Injector injects very high current loads into HV and EHV conductors with almost no loss. It is built for laboratories testing high-voltage cables and their accessories.
How
Getting that much current into a conductor cleanly is normally a slow and difficult preparation. The Power Injector uses the contact layer built by the Terminator In-Door, so the current goes in through a low-loss connection with no excess heating. A cumbersome task becomes easy, fast, and reliable.
Advantages
✓
Injects very high current loads into HV and EHV conductors with almost no loss
✓
Carries high current without excess heating
✓
Ready in around 20 to 30 minutes per conductor end
✓
Replaces a slow, cumbersome preparation with a repeatable one
Purpose-built for the high-current tests a high-voltage lab depends on.

Equalizer
Even current, for resistance you can trust.

What
The Equalizer gives uniform current distribution across a conductor, which is what reliable resistance measurement depends on. It is built for the short conductor samples used in cable production.
How
Accurate resistance measurement needs current spread evenly through the sample, and on a short sample that is hard to reach by hand. The Equalizer uses the contact layer built by the Terminator In-Door to distribute current uniformly at the end facet, so the reading holds up.
Advantages
✓
Distributes current uniformly for reliable resistance measurement
✓
Built for the short conductor samples used in production
✓
Prepared in around 20 to 30 minutes per conductor end
✓
Turns an unreliable manual step into a repeatable one
Built for the resistance measurements that keep cable production moving.
Power Injector and Equalizer.
Same machine
different measurement job

Trustworthy measurement, on every conductor you test.
